THE ACTIVITIES UNDERTAKEN BY ELIA PLC COVER THE FOLLOWING STAGES
- Designing of the Electrical Part.
- Production and mounting of the necessary main distribution switchboards.
- Building of medium voltage grid and optical network.
- Integrating of the system in the national electricity grid.
- Constructing of internal roads and crane sites.
- Start-up and adjustment tests.
Kamen Bryag and Kavarna Project
– seven wind generators
– five main distribution switchboards 20 kV, medium voltage grid, optical network and internal roads, grounding of the wind generators, awarded by Global Wind Power, Danemark.
Shabla Project
– seven wind generators
– two main distribution switchboards 20 kV, medium voltage grid and optical network, grounding of the wind generators, awarded by Global Wind Power, Danemark.
Kardam Project
– six wind generators
– main distribution switchboard 20 kV, medium voltage grid and optical network, grounding of the wind generators, awarded by Technomash AD.
Suvorovo Project
– thirty wind generators
– medium voltage grid and optical network, internal roads and crane sites, grounding of the wind generators, awarded by Iberdrolla, Spain.
Debrene Project
– three wind generators
– main distribution switchboard and step-up transformer 0.4/20 kV, awarded by Ecoenergy OOD.
Balgarevo Project
– main distribution switchboard 20 kV, awarded by VEP Engineering.
Targovishte Project
– main distribution switchboard 20 kV, awarded by Vertical and Co.
Chunchevo Project
– main distribution switchboard 20 kV, awarded by RE Engineering.
Chunchevo Project
– main distribution switchboard 20 kV, awarded by ET Degrets.
Kavarna Project
– main distribution switchboard 20 kV, awarded by VTK OOD.